搜索
imgboxbg
All categories

内页联系方式

Time of issue:2020-06-28 00:00:00

1

Coil: (021) 56678632
Asphalt tile:(021) 56453061
The Ministry felt: (021) 64380226
Provincial Department: (021) 56453393
Service hotline:(021) 64387777

Detail

name:YXT-17 SBSModified Asphalt Waterproofing Coating (Emulsified)

Retail price
0.0
Market price
0.0
Number of views:
1000
no:
4
Category
Coatings
Quantity
-
+
Stock:
0
1
Detail
Parameters

1.   Product Name:YXT-17 SBSModified Asphalt Waterproofing Coating (Emulsified)
2.  Product labeling:Emulsified Asphalt Waterproof CoatingL JC/T 408-2005
3.   Usage:
It is widely applied to the waterproofing works of the roof, basement, kitchen and bathroom of the industrial, commercial and civil buildings, roof garden, reservoir and swimming pool, especially suitable for the base with large deformation and complex structure.
4.   Product Performance:
It is one-component emulsified waterproof coating with high polymer modified asphalt as base material. After curing at room temperature, an elastic rubber waterproof layer is formed and has reliable waterproofness.
4.1  Appearance: The product has no chromatic aberration, gel, caking or asphalt wire after stirring.
4.2  Solid Content: ≥45%
4.3  Heat Resistance: No flow, slipping or dripping at the temperature of 80±2°C
4.4  Surface Drying Time: ≤8h
4.5  Hard Drying Time: ≤24h
4.6  Low Temperature Flexibility (Standard Conditions): no crack or break on the surface at a temperature of -15°C
4.7  Elongation at Break (Standard Conditions):≥600%
5.   Application Amount:
per square meter (m2), construction area, per millimeter (mm) coating thickness, about 2kg is used, and the actual coating thickness should comply with the design requirement.
6.   Construction Attentions:
6.1  The coating should be stirred evenly before construction.
6.2  The base is required to be clean and flat.
6.3  The construction temperature is 5-35°C.
6.4 It is not suitable for construction in case of raining in 24 hours.
6.5  Before the coating is cured, please pay attention to protection and prevent damage of the waterproof layer.
6.6  The construction is performed according to GB50346-2004 Technical Code for Roof Engineering and GB50108-2001 Technical Code for Waterproofing of Underground Works.
7.   Packaging and Storage:
7.1  The product is packaged in a 20kg iron drum.
7.2  During transportation and storage, different types of products should be stacked separately, and mixing is prevented. It should be stored in a ventilated place and not to be exposed to the sun and rain. The storage temperature should be 5-40°C.
7.3  The storage period is at least 6 months since production date under normal conditions of storage and transportation.

 

Shanghai Waterproof Building Materials (Group) Co., Ltd.
Address: No. 1400, Taihe Road, Shanghai
TEL: 021-64383623         021-64387777
Fax: 021-62891692         Zip Code:200040

We could not find any corresponding parameters, please add them to the properties table

相关案例

There is currently no content to display
Please add data record on website background.

Shanghai Building Materials Group Waterproof Materials Co., Ltd.    沪ICP备05017346号     Powered by www.300.cn